top of page

ČELÁKOVICE RAILWAY BRIDGE

Moving the existing structures during the construction of the new structures of the railway bridge in Čelákovice allows the pontoon system to operate efficiently in a very short time without disturbing the riverbed. Simultaneously , it transfers the structures to the shore and safely divides them into transportable pieces, all without any waste entering the river, which can arise from the disassembly of steel bridges.

Thanks to the option of assembly to fit the shape of the catamaran, the support points are optimized, eliminating the need to reinforce the structure.

bottom of page