Moving the existing structures during the construction of the new load-bearing structures of the railway bridge in Čelákovice allows the pontoon system to do everything in a very short time without interfering with the bottom of the river, at the same time moving the structures to the shore and safely dividing them into arbitrary transport pieces, all without any waste in the river, which division of steel bridges arises.
Thanks to the option of assembly to match the shape of the catamaran, the support points are optimized and there is no need to reinforce the structure.