top of page

PROJECT DAM BRIDGE ČESKÉ BUDĚJOVICE

Moving the structure on a lock or weir is always difficult due to the position of the structure built on the edge of different water levels.

The weir in České Budějovice needed to replace the service footbridges used as the only way to cross the weir.

The PMSS can be assembled so that the structure or the load is placed on the edge of the assembly and fully covers the eccentricity of the center of gravity.

bottom of page